Advanced Wastewater Treatment offers a refurbishment service to existing distributors to repair seals, arms and improve flow rates. Whilst the repair is taking place in our workshops, there is a need to keep the bed wet thus keeping the biological process un-interrupted. Advanced Pump and Hydro have a number of temporary bed wetting systems to suit the most challenging of projects these are –
Fully Automated System Using Submersible Pumps
Using Submersible pumps within the channel of the bed and feeding a poly pipe system covering the bed at set intervals, actuated valves, NRVS, bends, end caps all with Bauer couplings for ease of installation and dis-assembling. The system comes with a VFD within the panel so flow and pressure can be optimised.